Monday, 3 April 2017

Global Data Center Construction Market 2017 Industry Size, Research, Trends, Review & Analysis to 2022

Data Center Construction Market 2017

About Data Center Construction

A data center is a centralized storehouse — physical or virtual — for remote storage, and processing of data and information. Data centers constitute the backbone of essential business operations. There is a significant growth in the enterprise application worldwide because of the use of advanced technologies to gain competitive advantage. Enterprises are focusing on the construction of green data centers to reduce power consumption and protect the environment. The construction of a data center includes design, architecture, installation of electrical and mechanical systems, as well as general construction services. Data center certifications have gained importance, especially for colocation and managed hosting service providers. They use these certifications to widen their customer base.

Technavio’s analysts forecast the global data center construction market to grow at a CAGR of 8.32% during the period 2017-2021.   
        
                                                                 
Covered in this report The report covers the present scenario and the growth prospects of the global data center construction market for 2017-2021. To calculate the market size, the report considers the revenue generated from the investments made in new data centers and the renovation of existing ones to calculate the market size.

The market is divided into the following segments based on geography: • Americas
• APAC
• EMEA

Technavio's report, Global Data Center Construction Market 2017-2021, has been prepared based on an in-depth market analysis with inputs from industry experts. The report covers the market landscape and its growth prospects over the coming years. The report also includes a discussion of the key vendors operating in this market.

Key vendors • AECOM
• Arup Group
• Corgan
• DPR Construction
• Gensler
• HDR
• Page Southerland Page
• Holder Construction Group
• Jones Engineering Group
• Structure Tone
• Syska Hennessy
• Turner Construction

Other prominent vendors • Baselayer Technology
• Balfour Beatty
• Beca
• Cannon Technologies
• Clune Construction
• Commodore Contracting
• Constructora Sudamericana
• Drake & Scull International
• Fluor
• Gilbane
• Integrated Design Group
• Jacobs Engineering
• JE Dunn Construction
• Kirby Group
• Kohlberg Kravis Roberts
• M+W Group
• McGough
• Mercury Engineering
• Merrick
• Mortenson Construction
• Nova Mission Critical
• PTS
• Skanska
• Whiting-Turner

Market driver • Data center tax incentives and reduction in electricity cost.
• For a full, detailed list, view our report

Market challenge • Increased power consumption in data centers.
• For a full, detailed list, view our report

Market trend 
• Adoption of energy-efficient infrastructure.
• For a full, detailed list, view our report

Key questions answered in this report • What will the market size be in 2021 and what will the growth rate be?
• What are the key market trends?
• What is driving this market?
• What are the challenges to market growth?
• Who are the key vendors in this market space?
• What are the market opportunities and threats faced by the key vendors?
• What are the strengths and weaknesses of the key vendors? 

                                                                   
Table of Contents  
       
PART 01: Executive summary
PART 02: Scope of the report
PART 03: Research Methodology
PART 04: Introduction
• Key market highlights
PART 05: Market landscape
• Market overview
• Market size and forecast
PART 06: Five forces analysis
• Five forces analysis
PART 07: Market segmentation by end-user
• Global data center construction market by end-user
PART 08: Market segmentation by electrical construction
• Global data center construction market by electrical construction
PART 09: Market segmentation by mechanical construction
• Global data center construction by mechanical construction
• Market segmentation by tier type
• Global data center construction market by tier type
PART 10: Market segmentation by geography
• Global data center construction market by geography
PART 11: Decision framework
PART 12: Drivers and challenges
• Market drivers
• Impact of drivers on key customer segments
• Market challenges
• Impact of challenges on key customer segments
PART 13: Market trends
PART 14: Vendor landscape
• Competitive scenario
• Key vendor analysis
PART 15: Appendix
• List of abbreviations    
          
Continued…….

                                                                                                    
CONTACT US:

NORAH TRENT

Partner Relations & Marketing Manager
sales@wiseguyreports.com
www.wiseguyreports.com
Ph: +1-646-845-9349 (US)
Ph: +44 208 133 9349 (UK)

No comments:

Post a Comment